The booking was a 40-foot dry. The terminal tenders a 40-foot high cube, or the other way around. The warehouse asks whether to keep stacking. Rebuild the plan on the box that will roll. Then restuff, or hold.
This note is for planners who already optimized a carton file against one equipment type and now have a different box at the gate. It is not a rate forecast. As of November 7, 2026, the useful move is to duplicate the plan, switch the container, compare utilization and leftover, and tell the dock which pattern to stuff.
What the extra foot does, and what it does not
A standard 40-foot dry, often called a 40GP, has about 2.39 metres of internal height. A 40-foot high cube, a 40HC, has about 2.70 metres. That gap is roughly one extra layer for many carton heights. Internal length and width stay in the same family. Payload often stays in the same family too.
So the extra height can absorb a leftover layer. It can also do nothing. If the original plan already weight-limited, the extra metre of air does not add cartons. If the cartons are tall, one more layer may still miss the new roof line. If the cartons are short, you may gain a layer and then fail an axle check because the stack got higher.
A 20-foot in place of a 40-foot is a different problem. Length drops by half. Almost no 40-foot pattern survives that swap. Treat it as a new booking.
Why copying the old pattern onto the new box fails
Teams restuff from memory. They keep the same rows, add a layer, and call it a high-cube plan. The original pattern was legal on the shorter roof. On the taller box it can sit legal on height and illegal on weight distribution. The extra layer is mass high in the container. The first dray sees that mass on the rear axles.
The other failure is the reverse swap. A high-cube plan stuffed into a standard 40 will not close. The warehouse pulls the top layer, leaves a leftover, and asks whether to book a second box. That leftover is the height you already spent in the file. You would have seen it if you had rebuilt before the dock started.
Door opening height follows the box type. A high cube's door is taller. A standard door will stop a layer that cleared the high-cube roof in the 3D view. Measure the door on the box at the gate.
Verified gross mass follows the stuffed weight. A box-type swap keeps packed kilos the same. Adding a layer changes the weight, so file the kilos you will stuff. A VGM you sent for the original pattern is wrong once the extra layer goes in.
How to rebuild before the dock starts
- Freeze the carton file. Same SKUs, same taped sizes, same quantities. The equipment changed. The cargo did not.
- Confirm the equipment the terminal will tender, in writing: 20, 40GP, 40HC, or 45. Ask whether that box is at the gate or only on a list.
- Duplicate the original plan. Switch the container type. Optimize. Note utilization, leftover, payload headroom, and door clearance.
- If the new box is smaller, decide which leftover rolls, which leftover gets its own booking, and which leftover you tell sales will miss.
- Type the all-in on the equipment you will load. Some carriers price GP and HC on the same FAK. Some price them apart. Confirm the substitute quote in writing.
Palletizr holds both files. Duplicate the plan, change the container, and compare cost per carton before anyone pulls a layer. Fit the cargo on the box at the gate. If you are choosing between GP and HC before you book, the earlier 40HC vs 40GP decision tree is the planning version of this step. If a leftover remains after the rebuild, leave the winner and price the overflow.
What the receiver and the dray change
A high cube that the receiver cannot unload with their dock door or their forklift mast becomes detention. Ask whether destination can take HC before you accept the substitute as a free upgrade.
A taller stack can fail an axle check on the first dray even when ocean payload is legal. Place dense freight low and spread it along the length. Confirm the axle target with the dray carrier on this route. The center-of-gravity note is the placement step.
Duty does not change when the carrier swaps equipment. Packing into a taller box can change how many containers you need. The duty rate on the commercial invoice stays the rate on that heading.
A short check before you tell the warehouse to restuff
Restuff only after the new optimize exists, the door on that box closes, and the all-in on the substitute is in writing. If the substitute is smaller and the leftover is a SKU the customer already confirmed, show sales the cut before the dock pulls freight. If the substitute is taller and the extra layer puts you over payload, the extra air is unused. Keep the original pattern and send the extra cartons on their own plan.
As of November 7, 2026. Confirm the equipment at the gate and the all-in on that box before you change the floor pattern.
